Details for Control of PRT
PropertyValue
NameControl of PRT
DescriptionThe problem of precise longitudinal control of vehicles so that they follow predetermined time-varying speeds and positions has been solved. To control vehicles to the required close headway of at least 0.5 sec, the control philosophy is different from but no less rigorous than that of railroad practice. The preferred control strategy is one that could be called an "asynchronous point follower." Such a strategy requires no clock synchronization, is flexible in all unusual conditions, permits the maximum possible throughput, requires a minimum of maneuvering and uses a minimum of software. Since wayside zone controllers have in their memory exactly the same maneuver equations as the on-board computers, accurate safety monitoring is practical. The paper discusses the functions of vehicle control; the control of station, merge, and diverge zones; and central control.
FilenameControlOfPRT.pdf
Filesize225.95 kB
Filetypepdf (Mime Type: application/pdf)
Creatoradmin
Created On: 03/01/2007 21:17
ViewersEverybody
Maintained byEditor
Hits364 Hits
Last updated on 03/01/2007 23:07
Homepage
CRC Checksum
MD5 Checksum
© 2008 Personal Rapid Transit in New Zealand - Future Transit Now
Future Transit Now(tm) is a trademark of PRT New Zealand
Powered by Joomla! Software released under the GNU/GPL License.
Joomla Templates by JoomlaShack Joomla Templates